§ 23-1. Regulations adopted. |
§ 23-2. Plat requirements. |
§ 23-3. General requirements as to lots, blocks, water and sewer mains, streets, etc. |
Secs. 23-4, 23-5. - Reserved. |
§ 23-6. Compliance with chapter and regulations prerequisite to acceptance of streets and connections to water and sewer mains. |
§ 23-7. Extension of water and sewer lines to property conveyed. |
§ 23-8. When plat need not be prepared or approval obtained; authority to obtain building permit. |
Cross reference
Planning commission, §§ 2-29—2-34; buildings and building code, Ch. 6; electrical code, Ch. 8; fire prevention and protection, Ch. 9; gas fitting code, Ch. 12; municipal utilities, Ch. 17; plumbing, Ch. 20; street and sidewalks, Ch. 22
State law reference
Municipal planning generally, Ark. Stats., §§ 19-2825—19-2831; control of subdivisions, § 19-2829c.